Moon, Sungwoo 사진
Moon, Sungwoo
POSITION
professor
TEL
051-510-2344
EMAIL
sngwmoon@pusan.ac.kr
HOMEPAGE
MAJOR
GIS and Construction Management

Education

 

Ph.D., Department of Civil, Construction and Environmental Engineering (Construction Engineering and Management Major), North Carolina State University, 1996.

 

Research Area

 

Construction system standardization and productivity improvement

Construction risk control and management

Construction value engineering implementation

Remote monitoring system technology development for safety improvement

Construction automation for large-scaled manipulators

Smart machine guidance system development

 

Research Activities

 

Development of a smart machine guidance system for construction earthwork (funded by the Korea Agency for Infrastructure Technology Advancement) 2014.7.15.~2017.12.31.

 

Development of an internet of things (IOT) system for safety management at construction sites (funded by the National Research Foundation of Korea) 2015.5.11.1.~2018.10.31.

 

Selected Papers

 

Sungwoo Moon, Byongsoo Yang, Eungi Choi (2017). “Framework for Safe Concrete Placement Based on an Understanding of the Structural Behavior of Formwork.” ASCE Journal of Construction Engineering and Management (Submitted for 2nd round review) (SCIE)

 

Sungwoo Moon and Jongwon Seo (2017). “Virtual graphic representation of construction equipment for developing a 3D earthwork BIM.” Journal of Civil Engineering and Management (accepted) (SCIE)

 

Jiang-wei Xu, Li Jiang, and Sungwoo Moon (2017). “Determination of the Optimal Concession Period for BOT Contract Projects Based on a Discrete Stochastic Process Model.” ASCE Journal of Construction Engineering and Management, 143(4). (SCIE)

 

Sungwoo Moon, Jeonghwan Kim and Jongwon Seo (2017). “Prototyping a remotely-controlled machine for concrete surface grinding operations.“ Journal of Civil Engineering and Management, 23(2), 183-103 (SCIE)

 

Sungwoo Moon, Eungi Choi, Soonheon Hong (2016). “Creation of Robust Design Alternatives for Temporary Construction in Value Engineering.” ASCE Journal of Construction Engineering and Management, 142(3), 04015086 (SCIE)

 

Sungwoo Moon, Eungi Choi, Byongsoo Yang (2015). “Holistic integration based on USN technology for monitoring safety during concrete placement.“ Automation in Construction (57), 112-119 (SCIE)

 

Xu, J. and Moon, S. (2014). “Stochastic Revenue and Cost Model for Determining a BOT Concession Period under Multiple Project Constraints.” ASCE Journal of Management in Engineering 30(3), 04014011 (SCIE)

 

Jinkook Yang, Hangee Baeg, and Sungwoo Moon (2014). “Utilization of Contradiction for Creating Design Alternatives in Construction Value Engineering.” KSCE Journal of Civil Engineering, 18(2), 355-364 (SCIE)

 

Xin Zou and Sungwoo Moon (2014) “Hierarchical evaluation of on-site environmental performance to enhance a green construction operation.” Civil Engineering and Environmental Systems, 31(1), 5-23 (SCIE)

 

Jiangwei Xu , Sungwoo Moon (2013). "Stochastic Forecast of Construction Cost Index Using a Cointegrated Vector Auto­Regression Model." ASCE Journal of Management in Engineering, 29(1), 10-18 (SCIE)

 

Sungwoo Moon, Chideok Ha, Jinkook Yang (2012). "Structured Idea Creation for Improving the Value of Construction Design." ASCE Journal of Construction Engineering and Management, 138(7), 841-853 (SCIE)

 

Sungwoo Moon, Byungyoung Choi, Byungsoo Yang (2012) "USN­Based Data Acquisition for Increasing Safety in the Concrete Formwork Operation." ASCE Journal of Computing in Civil Engineering, 26(3), 271-281 (SCI)

 

Moon, S.W., Yang, B.S., Kim, J.H., and Seo, J.W. (2010). "Effectiveness of remote control for a concrete surface grinding machine" Automation in Construction, 19(6), 734-741 (SCIE)

 

Moon, S.W., and Yang, B.S. (2010). "Effective monitoring of the concrete pouring operation in an RFID-based environment" Journal of Computing in Civil Engineering, 24(1), 108-116 (SCI)

 

Moon, S.W., Kim, J.S., Kwon, K.N. (2007). Effectiveness of OLAP-based data management in construction cost estimate, Automation in Construction (16), May. 2007. 336-344 (SCIE)

 

"Graphic-Based Human-Machine Interface for Construction Manipulator Control."* Journal of Construction Engineering and Management, ASCE, New York, N.Y., Aug. 1998. (SCIE)